Contacts

Portfolio

Town-planning

TOWN PLANNING IMPLEMENTATION PLAN

10 months

Building-permit-01

BUILDING PERMIT

6 months

Construction02

CONSTRUCTION

16 months

VALZEMOLA

Cengio (SV) Via G. Mameli, Area “Valzemola” (greenfield)

Area of approx. 123 thousand square meters, located in the municipality of Cengio, on the border with Millesimo, 1.2 km from the highway exit (km 29 of the A6, Savona Turin) reachable in 3 min. (heavy traffic). The PRG places it in zone D8 with productive, commercial and transport service destination. Implementation by means of an agreed construction permit. The project also plans to intervene on approx. 13,500 sqm of agricultural use. The catchment area at 60 min. (evaluated within a basin calculated with heavy traffic) is 330,000 inhabitants.

Technical sheet (PDF – 2,7 MB)

LOCATION

Urban Planning Parameters

Land area: 104.000 sqm
Buildable area: 80.000 sqm
Maximum covered area: 50%
Maximum height: 12 mt
Intended use: Production – Logistics
Public areas standard: 20% of LA
Urbanization costs: Tbd

planning.process
PLANNING PROCESS

• Town planning implementation plan

Strenght-01
STRENGHT

• Excellent access to the main road
• Near A6 motorway exit
• Size of the area

Opportunity-01
OPPORTUNITY

• Greenfield ready to use

TESTFIT

Project Development Data

Buildable area: 80.000 sqm
Urbanization costs 1°/2°: 25 €/sqm
Infrastructure works: Tbd
Covered area: 31.350 sqm
Gross Leasable Area: 33.000 sqm

DISTANCE AND TIME

Highway exit
Kilometres
0
Minutes
0
Torino
Kilometres
0
Minutes
0
Genova
Kilometres
0
Minutes
0
Savona
Kilometres
0
Minutes
0
Nizza
Kilometres
0
Minutes
0