148.000 sqm area on the SP458 (Corso Ivrea), situated very favourably in relation to the A21 motorway Torino- Piacenza, less than 3 km from the Asti Ovest exit, which can be reached in 4 minutes. The area is mostly destined to production, and the project can be implemented through a town implementation plan and subsequently a building permit. The 60 min catchment area is evaluated at 1.5 mln inhabitants (considering heavy transport).
Technical sheet (PDF – 3,3 MB)
LOCATION
Urban Planning Parameters
Land area: 148.300 sqm Buildable area: 85.000 sqm Maximum covered area: 45.500 sqm Maximum height: Tbd Intended use: Production – Logistics Public areas standard: 20% of LA Urbanization costs: Tbd
PLANNING PROCESS
• Town planning implementation plan
STRENGHT
• Excellent access to the main road
• Near A21 motorway exit