Contacts

Portfolio

Town-planning

TOWN PLANNING IMPLEMENTATION PLAN

8 months

Building-permit-01

BUILDING PERMIT

6 months

Construction02

CONSTRUCTION

16 months

RILATE

Asti (AT), SP 458, Area “Rilate” (greenfield)

148.000 sqm area on the SP458 (Corso Ivrea), situated very favourably in relation to the A21 motorway Torino- Piacenza, less than 3 km from the Asti Ovest exit, which can be reached in 4 minutes.
The area is mostly destined to production, and the project can be implemented through a town implementation plan and subsequently a building permit. The 60 min catchment area is evaluated at 1.5 mln inhabitants (considering heavy transport).

Technical sheet (PDF – 3,3 MB)

LOCATION

Urban Planning Parameters

Land area: 148.300 sqm
Buildable area: 85.000 sqm
Maximum covered area: 45.500 sqm
Maximum height: Tbd
Intended use: Production – Logistics
Public areas standard: 20% of LA
Urbanization costs: Tbd

planning.process
PLANNING PROCESS

• Town planning implementation plan

Strenght-01
STRENGHT

• Excellent access to the main road
• Near A21 motorway exit

Opportunity-01
OPPORTUNITY

• Greenfield ready to use

TESTFIT

Project Development Data

Buildable area: 85.000 sqm
Covered area: 45.000 sqm
Gross Leasable Area: 47.250 sqm
Urbanization costs 1°/2°: 16,3 €/sqm
Infrastructure works: Tbd

DISTANCE AND TIME

Highway exit
Kilometres
0
Minutes
0
Torino
Kilometres
0
Minutes
0
Milano
Kilometres
0
Minutes
0
Piacenza
Kilometres
0
Minutes
0
Genova
Kilometres
0
Minutes
0