TOWN PLANNING IMPLEMENTATION PLAN

6 months

Building-permit-01

BUILDING PERMIT

4 months

Construction02

CONSTRUCTION

18 months

OVIGLIO

Oviglio (Alessandria), SP 245 (greenfield)

The area in question is located on the intersection of SP 245 and SP 240 and falls partly in the municipality of Oviglio (for 153.000 sqm) and partly in the municipality of Castellazzo B.da (for approx. 34,000 sqm). The site is about 7 km from the Alessandria Sud exit of the Torino Piacenza highway that can be reached in 8 minutes by Provincial Road 30. The catchment area at 60 min. (estimated within a basin calculated with heavy traffic) is 1.5 mln inhabitants.

Technical sheet (PDF – 2,3 MB)

LOCATION

Urban Planning Parameters

Land area: 187.000 sqm
Buildable area: 140.000 sqm
Maximum covered area: 110.000 sqm
Maximum height: 8 mt
Intended use: Production – Logistics
Public areas standard: 20% of LA
Urbanization costs: Tbd

planning.process
PLANNING PROCESS

• Town planning implementation plan

Strenght-01
STRENGHT

• Nearless motorway exit
• Compatible urban destination

Opportunity-01
OPPORTUNITY

• Greenfield ready to use

TESTFIT

Project Development Data

Buildable area: 140.000 sqm
Covered area: 80.000 sqm
Gross Leasable Area: 84.000 sqm
Urbanization costs 1°/2°: 6 €/sqm
Infrastructure works: € 500.000

DISTANCE AND TIME

Highway exit
Kilometres
0
Minutes
0
Torino
Kilometres
0
Minutes
0
Milano
Kilometres
0
Minutes
0
Genova
Kilometres
0
Minutes
0
Piacenza
Kilometres
0
Minutes
0