Contacts

Portfolio

Town-planning

TOWN PLANNING IMPLEMENTATION PLAN

Obtained

Building-permit-01

BUILDING PERMIT

1 month

Construction02

CONSTRUCTION

16 months

EX TEKSID

Carmagnola (TO), Via Umberto II, Area “Ex Teksid” (brownfield)

96.000 sqm brownfield area free for development previously belonging to Teksid, situated between Via Umberto II and Via Maruccano The area is located approximately 1 km from the Carmagnola exit of the A6 motorway (Torino Savona). The area is part of a town planning implementation plan and does not require environmental cleanup costs. The 60 min catchment area in evaluated at 23 mln inhabitants considering heavy transport.

Technical sheet (PDF – 2,7 MB)

LOCATION

Urban Planning Parameters

Land area: 96.000 sqm
Buildable area: 96.000 sqm
Maximum covered area: 49.000 sqm
Maximum height: 12 mt
Intended use: Production – Logistics
Public areas standard: Tbd
Urbanization costs: Tbd

planning.process
PLANNING PROCESS

• Final Design for Building Permit

Strenght-01
STRENGHT

• Nearless motorway exit
• Compatible urban destination

Opportunity-01
OPPORTUNITY

• Ready for construction
• Redevelopment of abandoned industrial sites (positive ESG)

TESTFIT

Project Development Data

Buildable area: 96.000 sqm
Covered area: 48.700 sqm
Gross Leasable Area: 49.600 sqm
Urbanization costs 1°/2°: Fulfilled
Infrastructure works: € 500.000

DISTANCE AND TIME

Highway exit
Kilometres
0
Minutes
0
Torino
Kilometres
0
Minutes
0
Milano
Kilometres
0
Minutes
0
Savona
Kilometres
0
Minutes
0
Genova
Kilometres
0
Minutes
0